Software Engineering Institute | Carnegie Mellon University
Software Engineering Institute | Carnegie Mellon University

Digital Library

Javascript is currently disabled for your browser. For an optimal search experience, please enable javascript.

Advanced Search

Basic Search

Content Type

Topics

Publication Date

Daniel S. Wall
September 2013 - Presentation Coaching a Winning Team

Topics: TSP

Authors: Dan Wall (The Wall Group)

Presentation given at TSP Symposium on September 17-19, 2013

September 2011 - Presentation A Survival Guide for Leaders

Topics: TSP

Authors: Dan Wall (The Wall Group)

Presentation given at TSP Symposium on September 20-22, 2011

September 2010 - Presentation Who You Gonna Call – TSP

Topics: TSP

Authors: Dan Wall (The Wall Group)

Presentation given at TSP Symposium on September 21-23, 2010

September 2008 - Presentation Speed Bumps on the Implementation Highway

Topics: TSP

Authors: Dan Wall (Vicarious Visions)

Presentation given at TSP Symposium on September 22-25, 2008

September 2007 - Presentation PSP Training for Everyone

Topics: TSP

Authors: Dan Wall (Vicarious Visions)

Presentation given at TSP Symposium on September 22-25, 2007

June 2007 - Technical Report Case Study: Accelerating Process Improvement by Integrating the TSP and CMMI

Topics: Process Improvement, TSP

Authors: Daniel S. Wall, Jim McHale, Marsha Pomeroy-Huff

This report describes how two NAVAIR organizations integrated the use of the TSP methodology and the CMM framework to progress from maturity level 1 to maturity level 4 in 30 months.

September 2006 - Presentation Using the TSP in a Systems Engineering Environment

Topics: TSP

Authors: Dan Wall (Vicarious Visions. Inc.)

Presentation given at TSP Symposium on September 18-21, 2006

December 2005 - Special Report Case Study: Accelerating Process Improvement by Integrating the TSP and CMMI

Topics: CMMI, Process Improvement, TSP

Authors: Daniel S. Wall, Jim McHale, Marsha Pomeroy-Huff

This report describes how two NAVAIR organizations integrated the use of the Team Software Process methodology and the CMM framework to progress from Maturity Level 1 to Maturity Level 4 in 30 months.

April 2005 - Technical Report Mapping TSP to CMMI

Topics: CMMI, Process Improvement, TSP

Authors: Jim McHale, Daniel S. Wall, Watts S. Humphrey, Michael D. Konrad

This 2005 report provides an essential element to facilitate the adoption of the TSP in organizations using CMMI, namely, a mapping of ideal TSP practices into the specific and generic practices of CMMI.